Countdown T-50

The last couple of weeks have more or less been spent in the garage; fixing, repairing and verifying every single component. We have installed central differential, pulled apart the drive shafts, axles, gear-box suspension, brakes, hubs and pretty much everything else. Still some more work to be done, like replacing the alternator and install the extra diesel tank, pumps and hosing. Once done the car should be in good condition for the 9000+ km trip.

error

Enjoy this blog? Please spread the word :)